Mostrar 1007 resultados

Objeto digital
DfRs 3 Whalen Cross-section, Trench I, N 20'-25', W 17'6", D=R1/50" (max)

DfRs 3 Whalen Cross-section, Trench I, N 20'-25', W 17'6", D=R1/50" (max)

2.1-01-01-17

View north from Milleken [Milliken] site to camp

View north from Milleken [Milliken] site to camp

17.1/03/31/170

Progress shot P. Harrison D. Rice

Progress shot P. Harrison D. Rice

17.1/03/31/171

Progress shot - upper horizons.  D. Sanger, P. Harrison, J. Sendey

Progress shot - upper horizons. D. Sanger, P. Harrison, J. Sendey

17.1/03/31/172

View, to N, of ridge between camp and CNR line

View, to N, of ridge between camp and CNR line

17.1/03/31/173

View south to Milliken Site

View south to Milliken Site

17.1/03/31/174

View south to Milliken Site

View south to Milliken Site

17.1/03/31/175

View south to Milliken site

View south to Milliken site

17.1/03/31/176

View south to Milliken Site

View south to Milliken Site

17.1/03/31/177

View from '59 trench of south face

View from '59 trench of south face

17.1/03/31/178

View of screens sited along trail, to NE of excavation

View of screens sited along trail, to NE of excavation

17.1/03/31/179

Wood Wedge

Wood Wedge

LoAA 9.1-3-24-18

Overview of ash and rock feature in level 11, unit N(2-4) E(4-6)

Overview of ash and rock feature in level 11, unit N(2-4) E(4-6)

LoAA 9.1-3-04-18

Tracing grid

Tracing grid

05.1-3-04-18

Basket with triangle line pattern

Basket with triangle line pattern

08.1-03-A-042-18

Backhoe working

Backhoe working

12.1-3-13-18

Overview of ash feature #3 in S(0-2) E(16-18)

Overview of ash feature #3 in S(0-2) E(16-18)

LoAA 9.1-3-03-18

View to W cross-section.  Trench I at E 20', max D of depression 18"

View to W cross-section. Trench I at E 20', max D of depression 18"

2.1-01-01-18

Work in progress in north east area of excavation

Work in progress in north east area of excavation

05.1-3-15-18

Kitchen fly

Kitchen fly

17.1/03/31/180

Resultados 581 a 600 de 1007