Preparing to dig deep pit L. to R. : T. Denton, J. Sendey D. Macleod
- 17.1/03/31/381
- Pièce
- [1961]
Fait partie de DjRi 3 Milliken Project, Charles Borden
This image shows three men digging in a trench.
48 résultats avec documents numérisés Afficher les résultats avec des objets numériques
Preparing to dig deep pit L. to R. : T. Denton, J. Sendey D. Macleod
Fait partie de DjRi 3 Milliken Project, Charles Borden
This image shows three men digging in a trench.
Preparing to dig deep pit. L. to R. : T. Denton, J. Sendey D. Macleod
Fait partie de DjRi 3 Milliken Project, Charles Borden
This image shows three men digging in a trench.
Fait partie de DjRi 3 Milliken Project, Charles Borden
This image shows a trench and a gravel removal ramp.
Screens at W - end of trench I. View to W
Fait partie de Dr. Charles Borden DfRs-3 project fonds
This image shows three screening stations set up next to the excavated trench.
Fait partie de Dr. Charles Borden DfRs-3 project fonds
This image shows three screening stations set up next to the trench. Trench is excavated through a knoll. The crew is sitting on top of the knoll in the upper right corner of the image.
General - crew water - digging in n 4-6 e 16-18
Fait partie de Dr. Charles Borden DhRt-4 Project Fonds
This image shows an excavation site with three people water-digging and a profile.
General - crew water - digging in n 4-6 e 16-18
Fait partie de Dr. Charles Borden DhRt-4 Project Fonds
This image shows an excavation site with two people water - digging and using a screen.
General - crew water - digging in n 4-6 e 16-18
Fait partie de Dr. Charles Borden DhRt-4 Project Fonds
This image shows an excavation site with three people water-digging and using a screen.